Getting two quotes on the table is the easy part. Comparing the numbers is almost the easy part too. The harder part — the one people skip because it feels awkward to ask — is working out exactly who you'd be contracting with, and whether they'll still be standing behind that contract in two years.
The short version. A company name on a brochure and the legal entity on your contract aren't always the same thing, and they aren't always the same thing they were last year. None of this is about assuming the worst of anyone. It's about information you're entitled to, and any builder worth hiring will hand it over without a fuss.
Start with the entity, not the brand
Builders operate through a registered company — an ACN, a specific legal entity that sits behind the trading name on the sign and the website. Brands can outlive the entity underneath them. A business can trade under the same name for years while the entity behind it changes, restructures, or gets replaced by a new one entirely.
Before you sign anything, ask for the exact legal entity name and ACN that will appear on your building contract, and run it yourself through an ASIC or ABN lookup. It takes two minutes and it's free. You're checking how long that specific entity has existed, not how long the brand has been around.
Check the registration directly
Every registered domestic builder in Victoria has a registration number with the Victorian Building Authority, and the VBA's public register lets you search it yourself — who holds it, whether it's current, and whether there's any disciplinary history attached. Don't take a registration number off a business card at face value. Look it up.
Ask about history, directly
A straightforward question gets a straightforward answer from a builder with nothing to hide: how long has this exact entity been trading, and has it, or has any closely related entity or director, been wound up, deregistered, or replaced by a new company before? People change structures for all kinds of ordinary reasons. But you're entitled to know the reason, in plain language, before you hand over a deposit — not to find it out halfway through your build.
Insurance isn't optional
For any domestic building work over $16,000 in Victoria, you should see evidence of domestic building insurance before you pay a deposit, not after. It's the safety net that covers you if the builder can't complete the job or fix defects — which matters most precisely when a builder's history is the thing in question. Ask for the certificate. A legitimate builder has it ready.
Talk to someone who's actually finished
A display suite or a handful of in-progress photos tells you what a builder can show you. A conversation with a past client — ideally one a year or two past handover, not mid-build — tells you what actually happened when the trades were slow, a variation came up, or something went wrong. Ask for a reference from a completed job, and ask them the questions you'd actually want answered.
Five questions worth asking any builder
- What's the exact legal entity on the contract, and how long has it been trading under that entity?
- Can I see your builder registration number, so I can check it myself?
- Has this entity, or a closely related one, been wound up or deregistered before — and if so, why?
- Can I see your current domestic building insurance certificate before I pay a deposit?
- Can I speak to a client from a job that's already been handed over, not just one still under way?
None of this is confrontational, and a builder who's confident in their own standing won't treat it that way. It's also worth comparing the whole contract once you've cleared this step — our guide to custom builder vs volume builder covers the pricing and contract questions, and our piece on the hidden costs of a knockdown rebuild covers what sits outside the number on the front page.
General guidance current at November 2026. Registration and insurance rules are summarised from the Victorian Building Authority and Consumer Affairs Victoria and may change. This is not legal advice — verify current requirements directly with those bodies before you sign.